Crepaco

Sold

Description

ZWIRNER #VT-216-03 ADDED 3/5/20$28500 LESS 10%FOB - HARTSVILLE TN ZWIRNER WHSEVT-216-03 CREPACO 5000 GALLON JACKETED VERTICAL SILO TYPE STORAGE TANK S/N- 3784 HORIZONTAL MECHANICAL CIP-ABLE AGITATOR STAINLESS STEEL ALCOVE CIP/VENT/OVERFLOW LINES SPRAY DEVICE 2” TRI-CLAMP OUTLET AR HEAT EXCHANGE JACKET PREVIOUSLY USED FOR AMMONIA 30 SQ. FT. JACKETED SURFACE AREA APPROX. 118.75” DIA x 150.75” HIGH. ? REMOVE AGITATION USED RECONDITIONED F.O.B. HARTSVILLE TN $28500.00 -10% RECONDITIONING TO INCLUDE:sandblast of exterior painted surfaces• repair or replace any deteriorated steel• pressure test any and all heat exchange surfaces• polishing of stainless steel parts & surfaces as needed• disassembly of mechanicals for inspection• new bearings seals and replacement of any worn parts• electrical test leak test & test run sanitary connections as specified by customer• adjustable legs with ball or pad feet• new elastomers• 2-coats primer on tanks• truck loadedAdditional Options may include:• any modifications needed• quality finish coat on tanks• skidding crating & boxing• inlet & outlet valves• instrumentation• electrical starters or disconnects• any other options per customer request

Specifications

ManufacturerCrepaco
ConditionUsed
Serial Number3784.0
Stock Number9458
Machine id9673
Machine description5,000 GALLON CREPACO VERTICAL TANK - JACKETED
Machine code09I
Equipped withCREPACO 5000 GALLON JACKETED VERTICAL SILO TYPE STORAGE TANK1 - USED CREPACO 5000 GALLON JACKETED VERTICAL SILO TYPE STORAGE TANK* HORIZONTAL MECHANICAL CIP-ABLE AGITATOR STAINLESS STEEL ALCOVE * CIP/VENT/OVERFLOW LINES SPRAY DEVICE* 2 IN TRI-CLAMP OUTLET AR HEAT EXCHANGE JACKET PREVIOUSLY USED FOR AMMONIA* 30 SQ. FT. JACKETED SURFACE AREA APPROX. 118.75 IN. DIA x 150.75 IN. HIGH. USED RECONDITIONED F.O.B. LOCATION * UNIT COMES WITH A HORIZONTAL MECHANICAL AGITATOR WHICH CAN BE REMOVED AND PATCHED OVER WITH A SANITARY WELD. PRICE IS THE SAME WITH OR WITHOUT THE AGITATOR.USED RECONDITIONED F.O.B. LOCATIONUnit is being offered reconditioned at the asking price. APPROX. 8-10 WEEK TURNAROUND TIMEF.O.B. LOCATIONRECONDITIONING TO INCLUDE:sandblast of exterior painted surfaces• repair or replace any deteriorated steel• pressure test any and all heat exchange surfaces• polishing of stainless steel parts & surfaces as needed• disassembly of mechanicals for inspection• new bearings seals and replacement of any worn parts• electrical test leak test & test run sanitary connections as specified by customer• adjustable legs with ball or pad feet• new elastomers• 2-coats primer on tanks• truck loadedAdditional Options may include:• any modifications needed• quality finish coat on tanks• skidding crating & boxing• inlet & outlet valves• instrumentation• electrical starters or disconnects• any other options per customer request
StatusS
Subcategory sort5000.0